Pinnacle Silver and Gold Intersects 9.69 g/t Gold at Potrero Project
Pinnacle Silver and Gold confirms robust mineralization at the Pinos Cuates mine, with recent drilling yielding 13.18 metres of 9.69 g/t gold and 143 g/t silver, as the company prepares for an expanded surface drilling program in October.
💡 Key Takeaways
- Hole EPUG26035 intersected 13.18 metres grading 9.69 g/t gold and 143 g/t silver.
- High-grade shoots identified with assays reaching 58.2 g/t gold and 631 g/t silver over 0.41 metres.
- Pinnacle has completed 76 holes to date, with 53 assay results currently informing the geological model.
- Surface drilling program scheduled for October to test gaps between historic mine workings.
📋 Executive Summary
📊 Sentiment Analysis
❓ Frequently Asked Questions
The Potrero Project is located in Mexico and includes the historic Pinos Cuates mine.
The company plans to continue drilling at Pinos Cuates, shift focus to the Dos de Mayo target, and launch a surface drilling program in October.
📰 Source
⚠️ Disclaimer: This content is for training purposes only and should not be considered financial advice. Always conduct your own research before making investment decisions.