🏭 Commodities 📊 Neutral 🌍 Mexico

Pinnacle Silver and Gold Intersects 9.69 g/t Gold at Potrero Project

Pinnacle Silver and Gold confirms robust mineralization at the Pinos Cuates mine, with recent drilling yielding 13.18 metres of 9.69 g/t gold and 143 g/t silver, as the company prepares for an expanded surface drilling program in October.

🕐 1 min read
Impact
10/10

💡 Key Takeaways

  • Hole EPUG26035 intersected 13.18 metres grading 9.69 g/t gold and 143 g/t silver.
  • High-grade shoots identified with assays reaching 58.2 g/t gold and 631 g/t silver over 0.41 metres.
  • Pinnacle has completed 76 holes to date, with 53 assay results currently informing the geological model.
  • Surface drilling program scheduled for October to test gaps between historic mine workings.

📋 Executive Summary

Pinnacle Silver and Gold reported high-grade drilling results from its Potrero Project in Mexico, confirming significant gold and silver mineralization at the Pinos Cuates mine. Hole EPUG26035 returned 13.18 metres grading 9.69 g/t gold and 143 g/t silver, while additional drilling continues to define the strike continuity of the Dos de Mayo vein.

📊 Sentiment Analysis

Sentiment
📊 Neutral
Impact Score
10/10
Region
🌍 Mexico
Asset Class
🏭 Commodities

❓ Frequently Asked Questions

📰 Source

📅 Originally published:
🔗 View Original Article

⚠️ Disclaimer: This content is for training purposes only and should not be considered financial advice. Always conduct your own research before making investment decisions.