Blue Moon Metals announced positive initial sensor-based ore sorting results for its Springer tungsten mine in Nevada. Testing on three stockpiled composites demonstrated a 1.3x to 3.4x uplift in WO3 grades with recovery rates between 93.3% and 97.5%, suggesting potential for improved project economics. The company plans further engineering studies in 2027 to evaluate integrating this pre-concentration technology into the mine's processing flowsheet.
Initial XRT ore sorting tests on Springer tungsten material show 1.3x to 3.4x grade uplifts with 93.3% to 97.5% WO3 recovery and up to 71.7% mass rejection, which the CEO says could significantly improve project economics ahead of production. For a junior developer advancing toward a production decision, such quantified technical de-risking is positive, though it remains a study on stockpiled samples rather than a resource or economic update.
- ▲ Positive initial ore sorting results announced November 23, 2026: 1.3x-3.4x WO3 grade uplift with 93.3%-97.5% recovery
- ▲ Medium- and low-grade composites upgraded to 0.49% and 0.24% WO3 from 0.20% and 0.07%
- ▼ Results come from hand-sorted stockpile composites (about 240-360 kg each), not the full resource
- ▼ Further work and optimizations are required before ore sorting can be included in the flowsheet