Press release 📈 Stocks 🌍 GLOBAL

Jaguar Uranium Reports Maiden 15.3 Mlb U3O8 Resource at Berlin Project

Jaguar Uranium has defined a maiden multi-commodity resource at its Berlin project in Colombia, reporting 15.3 Mlb of contained U3O8 across 2.9 km of a 10.5 km trend, supported by a cash-rich balance sheet of nearly US$18 million.

🕐 1 min read

1 assets impacted. Net bias: 1 Bullish, 0 Bearish, 0 Neutral. Strongest signal: JAGU ↑ 5/10 (60% confidence).

📊 Affected Assets (1)

JAGU
Bullish 🤖 60%
📅 Short-term 🌍 US · Explicit

The company defines its maiden resource at the 100%-owned Berlin project: 937 kt Indicated at 561 ppm U3O8 (1.2 Mlb) and 11,343 kt Inferred at 562 ppm (14.1 Mlb), with valuable co-products (rare earths, vanadium, nickel, zinc, molybdenum, phosphate) and the trend open along 10.5 km, only 2.9 km tested. For an exploration-stage uranium company, a compliant maiden MRE with substantial tonnage and expansion potential is a concrete, quantified de-risking step. Caveats: resources are not reserves, no economic viability is demonstrated, and the bulk of tonnage sits in the lower-confidence Inferred c

Catalysts
  • ▲ Maiden MRE (effective November 5, 2026): 1.2 Mlb Indicated and 14.1 Mlb Inferred U3O8
  • ▲ Mineralized trend open to the north along 10.5 km, only 2.9 km tested so far
Risk Factors
  • ▼ Mineral Resources are not Mineral Reserves and have no demonstrated economic viability
  • ▼ 87% of contained pounds (14.1 of 15.3 Mlb) are in lower-confidence Inferred category

🎯 Key Takeaways

  • Maiden MRE includes 937 kt Indicated at 561 ppm U3O8 and 11,343 kt Inferred at 562 ppm U3O8.
  • Resource defined over 2.9 km of a 10.5 km trend, which remains open to the north.
  • Company holds nearly US$18 million in cash with no debt to fund future exploration.
  • NSR cut-off of US$245/t used to account for uranium and co-products including rare earths and vanadium.

📝 Executive Summary

Jaguar Uranium Corp. announced a maiden Mineral Resource Estimate for its Berlin project in Colombia, identifying 1.2 Mlb of Indicated and 14.1 Mlb of Inferred U3O8. The polymetallic deposit also contains rare earth oxides, vanadium, nickel, zinc, molybdenum, and phosphate, with the mineralized trend remaining open for further expansion along its 10.5 km strike.

❓ FAQ

Does this mean the Berlin project can now be mined profitably?

No. The article states Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability; no reserves have been estimated.

How big is the new resource and can it grow?

The estimate covers 1.2 Mlb Indicated at 561 ppm U3O8 plus 14.1 Mlb Inferred at 562 ppm, defined over just 2.9 km of a 10.5 km trend that remains open to the north, so the company sees significant expansion and infill potential.