Third Pillar Power has commenced construction on Crown City Solar, a 22.5 MW-dc floating solar project located at a Suit-Kote quarry in Cortlandville, N.Y. The three-phase facility is expected to be fully operational by October 2027, serving 1,500 subscribers and offsetting 18,000 metric tons of carbon dioxide annually.
The article is a press release by privately held Third Pillar Power about its 22.5 MW-dc floating solar project. Colas is mentioned only in passing: its U.S. subsidiary Colas USA acquired Suit-Kote in October 2026, which hosts the solar site. This is a completed, non-quantified transaction with no stated financial effect on Colas, so the price outlook is unchanged.