EVE Energy debuted its comprehensive energy storage portfolio for AI data centers at the RE+ 2026 trade show. The new product line includes the 5 MWh S5-1P system and the Fortron backup cabinet, designed to support power requirements from grid connection to rack-level operations.
EVE Energy presents a new AIDC energy storage portfolio at RE+ 2026 in Las Vegas, including the S5-1P 5 MWh ESS, a 315 Ah frequency-regulation cell and the Fortron backup cabinet. This is a product showcase with no orders, revenues or guidance figures attached, so the near-term price effect is limited to sentiment about the AI-data-centre growth story.
- • World premiere of three-tier AIDC storage portfolio at RE+ 2026 in Las Vegas on 25 November 2026
- • New all-solid-state and sodium-ion battery technologies shown alongside the AIDC solutions
- • No contract values, order volumes or financial guidance stated
- • Claims such as 5 MWh capacity, 395 Wh/l density and 15-year Fortron lifetime are company statements, not independently verified